Contact Information:
Eden Town Hall
Attn: Building Department
2795 East Church Street
Eden, New York 14057

(716) 992-3576
(716) 992-4131 (Fax)

Code Enforcement Officer
David Rice


Hours of Operation:

Monday - Friday

8am-3pm

 

Fence Permit

BUILDING PERMIT APPLICATION
CHECKLIST FOR ACCESSORY STRUCTURE – FENCE


All of the following items MUST be submitted with this application in order to obtain a Building Permit

Completed BUILDING PERMIT APPLICATION form

A copy of the existing and most current and accurate survey or site plan.
Drawn to scale, proposed FENCING on the survey or site plan with the dimensions from the property lines setbacks.

* When drawing the proposed fence on your survey, keep in mind you will need to be able to maintain the fence on both sides of your property.

√ Brochure from manufacturer – showing fence type and materials etc.

Building Permit - Fence Permit
 

Permit Fee is $50.00

 

1. OWNER

Address
Address
City
State/Province
Zip/Postal
Applicant Is:

2. CONTACT INFO (if same as above list “same”)

3. CONTRACTOR INFO

First
Address
Address
City
State/Province
Zip/Postal

4. PROPOSED PROJECT (check all that apply)

Project is:
Fence Type

5. PROJECT DESCRIPTION (basic, use, size and cost of what is being proposed)

Fence Use
$

6. CONTRACTOR WORK

Are wages being paid for performance of this work (are you hiring a Contractor?)
IF YES, the contractor needs to provide proof of NYS Worker’s Compensation and Disability benefits. ACCEPTABLE PROOF

  • - Form DB121.1 NYS Disability
  • - CEE 200 for NYS Disability & Workers Compensation Exemption
  • - Form C105.2 or U-26.3 Workers Compensation
  • IF NOT hiring a contractor or Doing the work yourself - An Affidavit of Exemption is required –
    CLICK HERE TO VIEW & DOWNLOAD AFFIDAVIT OF EXEMPTION FORM

7: STARTED WORK

Has any work included in the application been started or completed

8: APPLICATION CERTIFICATION:

In consideration of the permit applied for, the undersigned hereby agrees that he/she will comply with the Code of
New York, Town of Eden Code and any other laws which may be applicable that he/she will preserve the establishment of lot lines, disclose all information to the Code Enforcement Officer, and that he/she will not use nor permit to be used the structure by the application until a Certificate of Occupancy (CO) or Certificate of Compliance (C/C) is legally issued.

9. INCLUSIONS

All documents and information required on the checklist MUST be submitted with this application.

Maximum file size: 30MB